TopIntroduction
Maintenance cost has become a considerable percentage of operational costs because of the rapid development of technologies and the increasing complexity of machines used in industry (Michalopoulos et al., 2009). For example, the annual cost of maintaining a military jet aircraft is around $1.6 million; approximately 11% of the total operating cost for an aircraft is spent on maintenance activities (Kumar, 1999). Also, each year over $300 billion are spent on plant maintenance and operations by U.S. industry, and it is estimated that approximately 80% of this amount is spent to correct the chronic failure of machines, systems, and people (Latino, 1999). The British Ministry of Technology Working Party report estimated that maintenance cost in the United Kingdom (UK) was approximately £3000 million annually in 1970 (Kelly, 1978).
Having Enterprise Maintenance Information Systems (EMIS) becomes very important. Therefore, based on maintenance platform using JAVA expert system shell technology, the development of a rule-based intelligent equipment trouble-shooting was proposed (Yao et al., 2006). Literature on enterprise maintenance systems considers EMIS to be composed of Operational Reliability, Maintenance Economics, Human Factors, Maintenance Program, and Maintenance Optimization sub-systems (Grimmelius et al., 1999; Jenab & Zolfaghari, 2008; Yao et al., 2006). In the pertaining literature, several maintenance strategies and architectures have been proposed. These strategies can be categorized into two major classes: with or without preventive maintenance (PM). PM based strategies include:
- 1.
Age-dependent (Pham & Wang, 2000; Sikorska et al., 2011; Ahmad & Kamaruddin, 2012).
- 2.
Periodic PM (Liu & Yu, 2004; Oke et al., 2009; Pecht & Jaai, 2010).
- 3.
Failure limit (Love & Guo, 1996; Niu et al., 2009; Gašperin et al., 2011).
- 4.
Sequential PM (Kijima & Nakagawa, 1992; Heng et al., 2009; Ahmad & Kamaruddin, 2012).
- 5.
Repair limit (Dohi et al., 1996; Asif Raza & Al-Turki, 2010).
Machine failures may cause consequences such as machinery damage, production losses, and personnel injury (Orhan et al., 2006; Renwick, 1984). In order to prevent such failures, an effective maintenance policy is required for the plant. Corrective Maintenance (CM) and Preventive Maintenance (PM) are the most common types of maintenance policies. In CM, maintenance calls occur by machine failure, which results in increasing operational costs and risk. In PM, maintenance is performed on a specified-time interval basis to mitigate the chance of the potential failure of the machine. The most critical decision in PM is to determine the appropriate time interval between PM activities (Renwick, 1984). An early maintenance schedule leads to unnecessary overhaul and teardown, which may be compounded by potential human errors during machine reassembly. On the other hand, a late maintenance schedule may result in damage and unplanned downtime, high costs, and production losses (Renwick, 1984). As result, Condition-Based Maintenance (CBM) is widely used because CBM employs condition-monitoring techniques to verify the condition of the machine for timely action.