Business Processes for Enhancing Coordination in Supply Networks

Business Processes for Enhancing Coordination in Supply Networks

Henry Xu
DOI: 10.4018/IJISSCM.2015040102
OnDemand:
(Individual Articles)
Available
$37.50
No Current Special Offers
TOTAL SAVINGS: $37.50

Abstract

In today's supply networks, characterised by increased complexity and uncertainty, fast flow of information and decisions across the supply network is fundamental for improving efficiency and customer service in the global market. In such a complex, dynamic environment, the overall performance of the supply network can only be improved through better coordination of inter-related, boundary-spanning business processes in the network. This paper proposes a conceptual framework for enhanced coordination of production planning and control activities across the supply network. The framework consists of seven business processes, among which four key business processes focusing on the short to medium term are chosen for design and modelling and subsequent implementation.
Article Preview
Top

1. Introduction

The last two decades have seen an increased level of research interest in supply network coordination (SNC) (e.g. Hahn, Duplaga, & Hartley, 2000; Arshinder, Kanda, & Deshmukh, 2008; Holweg & Pil, 2008). Coordination is usually involved in the joint decision-making process, which could help managers to choose the best possible action from a set of alternative options (Romano, 2003). It has been broadly recognised that inventory can be significantly reduced through timely communication of accurate information on demand and inventories (Vickery, Jayaram, Droge, & Calantone, 2003; Droge, Jayaram, & Vickery, 2004; Bayraktar, Koh, Gunasekaran, Sari, & Tatoglu, 2008; Caloiero, Strozzi, & Comenges, 2008). However, the full benefit of close coordination in a global supply network (e.g. in the computer, automotive or aerospace industry (Williams, Maull, & Ellis, 2002; Yusuf, Gunasekaran, & Abthorpe, 2004)), cannot be realised unless business processes between network companies can inter-operate (Ghiassi & Spera, 2003; Xu, Koh, & Parker, 2009; Zhao, Zhao, & Hou, 2010).

Existing enterprise information systems such as enterprise resources planning (ERP) and business-to-business (B2B) systems (e.g. B2B e-hub and electronic data interchange (EDI)), do not provide a full support for coordination of production planning and control activities in global supply networks (Puschmann & Alt, 2005; Koh, Gunasekaran, & Rajkumar, 2008). Similar to ERP, most of supply chain management (SCM) and advanced planning and scheduling (APS) systems currently available in the market do not manage the supply chain outside a company due to a centralised system architecture (Kelle & Akbulut, 2005; Stadtler, 2005). The recently emerged ERP II system has more functionalities than the traditional ERP system. However, industry analysts are cautiously optimistic about ERP II due to concerns related to failures of old ERP concepts (Koh et al., 2008).

B2B systems (e.g. B2B e-hubs, B2B portals) have the potential to facilitate information integration and cooperation between business partners (Sodhi, 2001; Zhao et al, 2010; Shaik & Abdul-Kader, 2013). However, most of these tools are still in their early stages of development for integration and coordination of the entire supply chain (Skjøtt-Larsen, Kotzab, & Grieger, 2003; Puschmann & Alt, 2005; Zhao et al, 2010). For example, process portals are mainly focused on the architecture for integration of inter-company information systems (Puschmann & Alt, 2005). Therefore, it is important to develop innovative business processes that facilitate boundary-spanning coordination and joint decision making at both the planning and the control levels between business partners in the supply network.

This paper contributes to the development of such boundary-spanning business processes for coordination of production plans and operational activities of network companies. These business processes have constituted a framework for future research in SNC. To achieve this, the paper starts with understanding of the business requirements for SNC. Then, a framework consisting of seven business processes for SNC is presented. These seven business processes are prioritised and four are chosen as the key coordination processes for the high-level design and modelling. This is followed by the implementation and evaluation of the pilot system for the four processes in the context of the Co-OPERATE project. Finally, the presented research work is concluded and future work indicated.

Complete Article List

Search this Journal:
Reset
Volume 17: 1 Issue (2024)
Volume 16: 1 Issue (2023)
Volume 15: 7 Issues (2022): 6 Released, 1 Forthcoming
Volume 14: 4 Issues (2021)
Volume 13: 4 Issues (2020)
Volume 12: 4 Issues (2019)
Volume 11: 4 Issues (2018)
Volume 10: 4 Issues (2017)
Volume 9: 4 Issues (2016)
Volume 8: 4 Issues (2015)
Volume 7: 4 Issues (2014)
Volume 6: 4 Issues (2013)
Volume 5: 4 Issues (2012)
Volume 4: 4 Issues (2011)
Volume 3: 4 Issues (2010)
Volume 2: 4 Issues (2009)
Volume 1: 4 Issues (2008)
View Complete Journal Contents Listing