Integrating Knowledge Management with Programme Management

Integrating Knowledge Management with Programme Management

Jill Owen
Copyright: © 2006 |Pages: 17
DOI: 10.4018/jkm.2006010104
OnDemand:
(Individual Articles)
Available
$37.50
No Current Special Offers
TOTAL SAVINGS: $37.50

Abstract

Knowledge reuse has long been an issue for organisations. The management, reuse and transfer of knowledge can improve project management capabilities (i.e., learning, memory, cycle time) resulting in continuous learning. Although knowledge management has been recognised as a critical success factor in programme management very little research has been conducted to date (Lycett, Rassau, & Danson, 2004; Soderlund, 2004). A framework is discussed that demonstrates how knowledge is created, transferred, captured and reused within project and programme management, resulting in improved project management maturity. The framework utilises a task based approach to knowledge management and assumes that knowledge is created, transferred and reused as a result of an individual performing a specific task, which in this context is a project at the project level and a programme at the programme level.

Complete Article List

Search this Journal:
Reset
Volume 20: 1 Issue (2024)
Volume 19: 1 Issue (2023)
Volume 18: 4 Issues (2022): 1 Released, 3 Forthcoming
Volume 17: 4 Issues (2021)
Volume 16: 4 Issues (2020)
Volume 15: 4 Issues (2019)
Volume 14: 4 Issues (2018)
Volume 13: 4 Issues (2017)
Volume 12: 4 Issues (2016)
Volume 11: 4 Issues (2015)
Volume 10: 4 Issues (2014)
Volume 9: 4 Issues (2013)
Volume 8: 4 Issues (2012)
Volume 7: 4 Issues (2011)
Volume 6: 4 Issues (2010)
Volume 5: 4 Issues (2009)
Volume 4: 4 Issues (2008)
Volume 3: 4 Issues (2007)
Volume 2: 4 Issues (2006)
Volume 1: 4 Issues (2005)
View Complete Journal Contents Listing