Risk Management in Distributed IT Projects: Integrating Strategic, Tactical, and Operational Levels

Risk Management in Distributed IT Projects: Integrating Strategic, Tactical, and Operational Levels

Rafael Prikladnicki (Pontifícia Universidade Católica do Rio Grande do Sul, Brazil), Roberto Evaristo (University of Illinois at Chicago, USA), Jorge Luis Nicolas Audy (Pontifícia Universidade Católica do Rio Grande do Sul, Brazil) and Marcelo Hideki Yamaguti (Pontifícia Universidade Católica do Rio Grande do Sul, Brazil)
Copyright: © 2006 |Pages: 18
DOI: 10.4018/jec.2006100101
OnDemand PDF Download:
$37.50

Abstract

Distributed IT projects exhibit certain features that make them fundamentally different from traditional co-located projects, not only involving additional steps and decisions, but also impacting the risk management process. The goal of this paper is to discuss these impacts and to suggest the development of an integrated risk management process taking into account site dispersion, time zone difference, and cultural boundaries not only at the operational, but also at the tactical and strategic level. We also report results of an exploratory case study conducted in a software development center (a Brazilian subsidiary of a U.S. corporation) in support of such a model, and conclude with a discussion of theoretical and practical implications of our work.

Complete Article List

Search this Journal:
Reset
Open Access Articles: Forthcoming
Volume 13: 4 Issues (2017): Forthcoming, Available for Pre-Order
Volume 12: 4 Issues (2016)
Volume 11: 4 Issues (2015)
Volume 10: 4 Issues (2014)
Volume 9: 4 Issues (2013)
Volume 8: 4 Issues (2012)
Volume 7: 4 Issues (2011)
Volume 6: 4 Issues (2010)
Volume 5: 4 Issues (2009)
Volume 4: 4 Issues (2008)
Volume 3: 4 Issues (2007)
Volume 2: 4 Issues (2006)
Volume 1: 4 Issues (2005)
View Complete Journal Contents Listing