An Empirical Take on Qualitative and Quantitative Risk Factors

An Empirical Take on Qualitative and Quantitative Risk Factors

K. Madhu Kishore Raghunath, S. Lakshmi Tulasi Devi, Chandra Sekhar Patro
Copyright: © 2017 |Pages: 15
DOI: 10.4018/IJRCM.2017100101
OnDemand:
(Individual Articles)
Available
$37.50
No Current Special Offers
TOTAL SAVINGS: $37.50

Abstract

Companies face a great challenge of balancing both risk and return on par. In today's volatile economic environment, success depends on strategically managing risks. All organisations accept risk in every decision that they take and risk management is therefore it is strategic when done proactively. Some risks are financial or quantitative and others are associated with behavioral factors or qualitative. Effective strategic risk management must address both quantitative and qualitative factors. Some factors are difficult to quantify or even identify. This study develops a framework from a literature review to identify most relevant quantitative and qualitative risks affecting public as well as private organisations. Risk planning, analysis and mitigation techniques are then proposed along with guidelines for matching each to a specific contest. Surveys are used to collect evidence from educational institutions, hospitals, banks, and manufacturing organizations to build the model. Non-paramateric statistical methods are used to validate the most significant combination of risk factors.
Article Preview
Top

Introduction

‘Success lies beyond risk’ is an old saying which all have seen and heard about, but now-a-days the new mantra is ‘Marginal success lies beyond risk’ based on how an individual manage it tactfully, and of course now a day’s marginal risk is no risk when compared to the returns obtained. Risk is ubiquitous and people are acquainted of the damage that it can cause if a decision goes wrong. People are being optimistic never than before with their ventures and are ready to go that extra step to delineate the difference between success and failure. Heinz-Peter Berg (2010) believes that, Risk is unavoidable and present in every human situation. It is present in daily operations of the public and private sector organizations. Depending on the context (Insurance, Stakeholder, Technical causes), there are many accepted definitions of risk in use. Risk has become a part and parcel of our lives whether or not one is engaged in economic activities or any other activity. Risk event is recorded by incidents/accidents leading to serious economic loss or loss of life. Avoiding such situations has bought the necessity for the analysis and risk assessment activities in different projects and companies.

In the competitive business environment, organizations are seeking to get and stay ahead of the competition by making significant advances in the products and services, and operating as efficiently as possible. Many businesses use projects as vehicles to deliver that competitive advantage and when companies deal with projects there is always a collateral risk involved and this is where the need arises to distinguish the risk and find a way to mitigate it. The common concept in all definitions is uncertainty of outcomes. Where they differ is in how they characterize outcomes. Some describe risk as having only adverse consequences, while others are neutral. Risk can be broadly defined as the probability of variation surrounding an anticipated outcome (Carter and Rogers, 2008). Jaffari (2001) observed risk as the exposure to loss, gain, or the probability of occurrence of loss/gain multiplied by its respective magnitude. Kartam (2001) has presented his views of risk as the probability of occurrence of some uncertain, unpredictable and even undesirable events that would change prospects for the probability on a given investment. Risk has been examined across multiple disciplines including economics and management. Wiseman and GómezMejía (1998); Stultz (1996); Zsidisin (2003) analysed that within the project management context, the important thing is not keep risk out projects, but to ensure that the inevitable risk associated with every project is at a level which is acceptable, and it is effectively managed. Every organization is exposed to many types of risk; and organizations should develop a risk management culture. All types of risks have to be identified, assessed and managed. This approach gives the organization the ability to understand the sum of risks and their interdependence (Berg, 2010). Bahar and Crandall (1990) defined the risk management as a formal orderly process for systematically identifying, analyzing, and responding to risk events throughout the life of a project to obtain the optimum or acceptable degree of risk elimination or control. According to Cheng et al. (2012) Risk management is the process whereby decisions are made to accept a known or assessed risk or the implementation of action to reduce the consequences or the probability of occurrence of an adverse event. In the same way, Alhawari et al. (2012) reviewed that Risk management refers to strategies, methods and supporting tools to identify and control risk to an acceptable level. Simmons (2002) provided a definition for the risk management as the sum of all proactive management-directed activities, within a program that is intended to acceptably accommodate the possibly failures in elements of the program. For quite some time now, researchers have had a common interest in the area of risk and uncertainty in IT projects.

Complete Article List

Search this Journal:
Reset
Volume 13: 1 Issue (2025): Forthcoming, Available for Pre-Order
Volume 12: 1 Issue (2024): Forthcoming, Available for Pre-Order
Volume 11: 4 Issues (2022): 1 Released, 3 Forthcoming
Volume 10: 4 Issues (2021)
Volume 9: 4 Issues (2020)
Volume 8: 4 Issues (2019)
Volume 7: 4 Issues (2018)
Volume 6: 4 Issues (2017)
Volume 5: 4 Issues (2016)
Volume 4: 4 Issues (2015)
Volume 3: 4 Issues (2014)
Volume 2: 4 Issues (2013)
Volume 1: 4 Issues (2012)
View Complete Journal Contents Listing