MLA
Shankar, N. Ravi, et al. "Fuzzy Critical Path Method Based on a New Approach of Ranking Fuzzy Numbers using Centroid of Centroids." IJFSA vol.3, no.2 2013: pp.16-31. http://doi.org/10.4018/ijfsa.2013040102
APA
Shankar, N. R., Saradhi, B. P., & Babu, S. S. (2013). Fuzzy Critical Path Method Based on a New Approach of Ranking Fuzzy Numbers using Centroid of Centroids. International Journal of Fuzzy System Applications (IJFSA), 3(2), 16-31. http://doi.org/10.4018/ijfsa.2013040102
Chicago
Shankar, N. Ravi, B. Pardha Saradhi, and S. Suresh Babu. "Fuzzy Critical Path Method Based on a New Approach of Ranking Fuzzy Numbers using Centroid of Centroids," International Journal of Fuzzy System Applications (IJFSA) 3, no.2: 16-31. http://doi.org/10.4018/ijfsa.2013040102
Export Reference