A Statewide Transition From Campus to Centralized System: Challenges and Accomplishments

A Statewide Transition From Campus to Centralized System: Challenges and Accomplishments

Joseph Barjis
Copyright: © 2009 |Pages: 16
DOI: 10.4018/jcit.2009010102
OnDemand:
(Individual Articles)
Available
$37.50
No Current Special Offers
TOTAL SAVINGS: $37.50

Abstract

This case describes statewide implementation of Liquidus CS in the Grand System of Universities, represents transition from campus wide to centralized system. It documents why this project was initiated, how it was implemented taking into account its statewide scope, and the major challenges posed by the fact that Liquidus Inc. was acquired by another rival company while the implementation of Liquidus CS was in progress.

Complete Article List

Search this Journal:
Reset
Volume 26: 1 Issue (2024)
Volume 25: 1 Issue (2023)
Volume 24: 5 Issues (2022)
Volume 23: 4 Issues (2021)
Volume 22: 4 Issues (2020)
Volume 21: 4 Issues (2019)
Volume 20: 4 Issues (2018)
Volume 19: 4 Issues (2017)
Volume 18: 4 Issues (2016)
Volume 17: 4 Issues (2015)
Volume 16: 4 Issues (2014)
Volume 15: 4 Issues (2013)
Volume 14: 4 Issues (2012)
Volume 13: 4 Issues (2011)
Volume 12: 4 Issues (2010)
Volume 11: 4 Issues (2009)
Volume 10: 4 Issues (2008)
Volume 9: 4 Issues (2007)
Volume 8: 4 Issues (2006)
Volume 7: 4 Issues (2005)
Volume 6: 1 Issue (2004)
Volume 5: 1 Issue (2003)
Volume 4: 1 Issue (2002)
Volume 3: 1 Issue (2001)
Volume 2: 1 Issue (2000)
Volume 1: 1 Issue (1999)
View Complete Journal Contents Listing