Using Resource Constraints to Control the Incremental Development of Large Scale MIS Projects

Using Resource Constraints to Control the Incremental Development of Large Scale MIS Projects

Suleiman K. Kassicieh, Robert S. Tripp
Copyright: © 1989 |Pages: 13
DOI: 10.4018/irmj.1989040103
OnDemand:
(Individual Articles)
Available
$37.50
No Current Special Offers
TOTAL SAVINGS: $37.50

Abstract

Incremental MIS design and development methodologies have received limited attention in the MIS literature. This paper describes incremental methodologies appropriate for very large scale MIS developments which can cost millions of dollars and take years to develop. This paper describes a “resource constrained” implementation planning process designed to control both the costs of incremental projects and the functional evolution of the system. The paper also discusses how the process was used in a very large scale system development.

Complete Article List

Search this Journal:
Reset
Volume 37: 1 Issue (2024)
Volume 36: 1 Issue (2023)
Volume 35: 4 Issues (2022): 3 Released, 1 Forthcoming
Volume 34: 4 Issues (2021)
Volume 33: 4 Issues (2020)
Volume 32: 4 Issues (2019)
Volume 31: 4 Issues (2018)
Volume 30: 4 Issues (2017)
Volume 29: 4 Issues (2016)
Volume 28: 4 Issues (2015)
Volume 27: 4 Issues (2014)
Volume 26: 4 Issues (2013)
Volume 25: 4 Issues (2012)
Volume 24: 4 Issues (2011)
Volume 23: 4 Issues (2010)
Volume 22: 4 Issues (2009)
Volume 21: 4 Issues (2008)
Volume 20: 4 Issues (2007)
Volume 19: 4 Issues (2006)
Volume 18: 4 Issues (2005)
Volume 17: 4 Issues (2004)
Volume 16: 4 Issues (2003)
Volume 15: 4 Issues (2002)
Volume 14: 4 Issues (2001)
Volume 13: 4 Issues (2000)
Volume 12: 4 Issues (1999)
Volume 11: 4 Issues (1998)
Volume 10: 4 Issues (1997)
Volume 9: 4 Issues (1996)
Volume 8: 4 Issues (1995)
Volume 7: 4 Issues (1994)
Volume 6: 4 Issues (1993)
Volume 5: 4 Issues (1992)
Volume 4: 4 Issues (1991)
Volume 3: 4 Issues (1990)
Volume 2: 4 Issues (1989)
Volume 1: 1 Issue (1988)
View Complete Journal Contents Listing