MLA
Yang, Ning, et al. "Simulation-Based Scheduling of Waterway Projects Using a Parallel Genetic Algorithm." Transportation Systems and Engineering: Concepts, Methodologies, Tools, and Applications, edited by Information Resources Management Association, IGI Global, 2015, pp. 334-347. https://doi.org/10.4018/978-1-4666-8473-7.ch016
APA
Yang, N., Wang, S., & Schonfeld, P. (2015). Simulation-Based Scheduling of Waterway Projects Using a Parallel Genetic Algorithm. In I. Management Association (Ed.), Transportation Systems and Engineering: Concepts, Methodologies, Tools, and Applications (pp. 334-347). IGI Global. https://doi.org/10.4018/978-1-4666-8473-7.ch016
Chicago
Yang, Ning, Shiaaulir Wang, and Paul Schonfeld. "Simulation-Based Scheduling of Waterway Projects Using a Parallel Genetic Algorithm." In Transportation Systems and Engineering: Concepts, Methodologies, Tools, and Applications, edited by Information Resources Management Association, 334-347. Hershey, PA: IGI Global, 2015. https://doi.org/10.4018/978-1-4666-8473-7.ch016
Export Reference