Search the World's Largest Database of Information Science & Technology Terms & Definitions
InfInfoScipedia LogoScipedia
A Free Service of IGI Global Publishing House
Below please find a list of definitions for the term that
you selected from multiple scholarly research resources.

What is Backwards Scheduling

Handbook of Research on Global Competitive Advantage through Innovation and Entrepreneurship
A scheduling method that plans backwards from the due date (or time) to determine the start date (or time).
Published in Chapter:
Workload Control: Emphasizing Speed to Beat the Competition
Nuno O. Fernandes (Instituto Politécnico de Castelo Branco, Portugal)
DOI: 10.4018/978-1-4666-8348-8.ch005
Abstract
Global competition and changing customer requirements are putting major challenges in the production planning and control systems of manufacturing enterprises. Production planning and control requires robust methods able to cope with demand variability, processing times variability, routing sequences, resource availability, etc., between other sources of variation. Production planning and control significantly influences target performance criteria such as the delivery time, on-time delivery, work-in-process inventory, and resources utilization. Therefore, production planning and control is strategically important for the economic success of these enterprises and innovative production planning and control methods are required. This chapter describes how workload control, a leading production planning and control system for small- and medium-sized enterprises, operates and illustrates how it aids in shortening and stabilising throughput times based on a simulation study of a small made-to-order production system.
Full Text Chapter Download: US $37.50 Add to Cart
eContent Pro Discount Banner
InfoSci OnDemandECP Editorial ServicesAGOSR