Search the World's Largest Database of Information Science & Technology Terms & Definitions
InfInfoScipedia LogoScipedia
A Free Service of IGI Global Publishing House
Below please find a list of definitions for the term that
you selected from multiple scholarly research resources.

What is Makespan

Emerging Challenges, Solutions, and Best Practices for Digital Enterprise Transformation
The elapsed time between the start and finish of a sequence of operations in a set of machines. The completion time of the last job or task in an operation or process.
Published in Chapter:
Manufacturing Scheduling Strategy for Digital Enterprise Transformation
Halit Alper Tayali (School of Business, Istanbul University, Turkey)
DOI: 10.4018/978-1-7998-8587-0.ch006
Abstract
Scientific research and mathematics are the driving forces of economic progress. Firms that can align themselves with the contemporary information and communication technology era through their decisions about the digital transformation and sustain their competitive advantage might have a higher chance of survival compared to those that cannot. The managerial decisions that revolve around manufacturing focus on production planning and control along with cost minimization. Scheduling and sequencing activities lie at the heart of production planning and control. This chapter provides a basic perspective for the transformation from the traditional batch processing type of short-term manufacturing scheduling to the single-piece flow type of scheduling while presenting a novel manufacturing scheduling model to minimize the manufacturing cost for varying setup times and job sequence.
Full Text Chapter Download: US $37.50 Add to Cart
More Results
Combined Electromagnetism-Like Algorithm with Tabu Search to Scheduling
The makespan is the total length of the schedule (that is, when all the jobs have finished processing).
Full Text Chapter Download: US $37.50 Add to Cart
Schedulers Based on Ant Colony Optimization for Parameter Sweep Experiments in Distributed Environments
Is defined as the amount of time, from start to finish for completing a set of jobs, i.e. the maximum completion time of all jobs.
Full Text Chapter Download: US $37.50 Add to Cart
Full Text Chapter Download: US $37.50 Add to Cart
Cuckoo Search Algorithm for Solving Real Industrial Multi-Objective Scheduling Problems
Full Text Chapter Download: US $37.50 Add to Cart
Cuckoo Search Algorithm for Solving Real Industrial Multi-Objective Scheduling Problems
Makespan is defined as the completion time of the last job to leave the system.
Full Text Chapter Download: US $37.50 Add to Cart
An Improved Monkey Search Algorithm to Solve the Flexible Job Shop Scheduling Problems With Makespan Objective
Full Text Chapter Download: US $37.50 Add to Cart
eContent Pro Discount Banner
InfoSci OnDemandECP Editorial ServicesAGOSR