Current State of Highway Projects Planning and Scheduling

Current State of Highway Projects Planning and Scheduling

Sunil Sharma, V. K. Bansal, Raman Parti
ISBN13: 9781466696198|ISBN10: 1466696192|EISBN13: 9781466696204
DOI: 10.4018/978-1-4666-9619-8.ch017
Cite Chapter Cite Chapter

MLA

Sharma, Sunil, et al. "Current State of Highway Projects Planning and Scheduling." Civil and Environmental Engineering: Concepts, Methodologies, Tools, and Applications, edited by Information Resources Management Association, IGI Global, 2016, pp. 434-447. https://doi.org/10.4018/978-1-4666-9619-8.ch017

APA

Sharma, S., Bansal, V. K., & Parti, R. (2016). Current State of Highway Projects Planning and Scheduling. In I. Management Association (Ed.), Civil and Environmental Engineering: Concepts, Methodologies, Tools, and Applications (pp. 434-447). IGI Global. https://doi.org/10.4018/978-1-4666-9619-8.ch017

Chicago

Sharma, Sunil, V. K. Bansal, and Raman Parti. "Current State of Highway Projects Planning and Scheduling." In Civil and Environmental Engineering: Concepts, Methodologies, Tools, and Applications, edited by Information Resources Management Association, 434-447. Hershey, PA: IGI Global, 2016. https://doi.org/10.4018/978-1-4666-9619-8.ch017

Export Reference

Mendeley
Favorite

Abstract

Highway projects involve huge capital investments and prolonged durations. A number of researchers have developed various computer-based tools and techniques to help planners prepare plans and schedules based on their specific needs. CPM is the predominant scheduling method used in construction industry. However, its inability to efficiently plan and schedule repetitive projects such as highways has widely been recognized. Linear scheduling method on the other hand, was specifically designed and developed for repetitive projects. The aim of this paper is to study various planning and scheduling methods discussed in the literature and evaluate their suitability for highway projects. On the basis of literature study, location based planning utilizing linear scheduling method seems to be the most logical and efficient way of planning highway projects for various reasons discussed in the paper. It is however a new concept and therefore has limited use in practice.

Request Access

You do not own this content. Please login to recommend this title to your institution's librarian or purchase it from the IGI Global bookstore.