Operation and Startup of Three-Phase Grid-Connected PWM Inverter for an Experimental Test Bench With DSPACE Real-Time Implementation of PQ Control: Active and Reactive Powers Control Strategy of the Grid Side Converter With Experimental Integration

Operation and Startup of Three-Phase Grid-Connected PWM Inverter for an Experimental Test Bench With DSPACE Real-Time Implementation of PQ Control: Active and Reactive Powers Control Strategy of the Grid Side Converter With Experimental Integration

Kamal Elyaalaoui, Moussa Labbadi, Khalid Chigane, Mohammed Ouassaid, Mohamed Cherkaoui
ISBN13: 9781799874478|ISBN10: 1799874478|ISBN13 Softcover: 9781799874485|EISBN13: 9781799874492
DOI: 10.4018/978-1-7998-7447-8.ch008
Cite Chapter Cite Chapter

MLA

Elyaalaoui, Kamal, et al. "Operation and Startup of Three-Phase Grid-Connected PWM Inverter for an Experimental Test Bench With DSPACE Real-Time Implementation of PQ Control: Active and Reactive Powers Control Strategy of the Grid Side Converter With Experimental Integration." Modeling and Control of Static Converters for Hybrid Storage Systems, edited by Arezki Fekik and Nacereddine Benamrouche, IGI Global, 2022, pp. 207-232. https://doi.org/10.4018/978-1-7998-7447-8.ch008

APA

Elyaalaoui, K., Labbadi, M., Chigane, K., Ouassaid, M., & Cherkaoui, M. (2022). Operation and Startup of Three-Phase Grid-Connected PWM Inverter for an Experimental Test Bench With DSPACE Real-Time Implementation of PQ Control: Active and Reactive Powers Control Strategy of the Grid Side Converter With Experimental Integration. In A. Fekik & N. Benamrouche (Eds.), Modeling and Control of Static Converters for Hybrid Storage Systems (pp. 207-232). IGI Global. https://doi.org/10.4018/978-1-7998-7447-8.ch008

Chicago

Elyaalaoui, Kamal, et al. "Operation and Startup of Three-Phase Grid-Connected PWM Inverter for an Experimental Test Bench With DSPACE Real-Time Implementation of PQ Control: Active and Reactive Powers Control Strategy of the Grid Side Converter With Experimental Integration." In Modeling and Control of Static Converters for Hybrid Storage Systems, edited by Arezki Fekik and Nacereddine Benamrouche, 207-232. Hershey, PA: IGI Global, 2022. https://doi.org/10.4018/978-1-7998-7447-8.ch008

Export Reference

Mendeley
Favorite

Abstract

The main objective of this chapter is the experimental validation of active and reactive power control at the connection point for a three-phase grid connected inverter. It gives an overview on the adopted vector control strategy, regulation of the angle of orientation of the blades (pitch control), synchronization grid side converter to the power network using phase closed loop (PLL). Once the experimental test bench is described, the authors devote a first part to the design of the block circuit diagram of the experimental platform and the control strategy implemented in the DSPace DS1104, and they suggest some steps to associate the inverter to the electrical network. Subsequently, they discuss the experimental results validating the proposed power control. The purpose of this experimental results is the DSPACE real-time implementation of PQ control using three-phase inverter and development of a startup algorithm of the experimental test bench.

Request Access

You do not own this content. Please login to recommend this title to your institution's librarian or purchase it from the IGI Global bookstore.