Implementation Failure of an Integrated Software Package: A Case Study from the Far East

Implementation Failure of an Integrated Software Package: A Case Study from the Far East

S. Sarker
ISBN13: 9781599043968|ISBN10: 1599043963|ISBN13 Softcover: 9781599043975|EISBN13: 9781599043982
DOI: 10.4018/978-1-59904-396-0.ch019
Cite Chapter Cite Chapter

MLA

Sarker, S. "Implementation Failure of an Integrated Software Package: A Case Study from the Far East." Cases on Information Technology and Business Process Reengineering, edited by Mehdi Khosrow-Pour, D.B.A., IGI Global, 2006, pp. 302-316. https://doi.org/10.4018/978-1-59904-396-0.ch019

APA

Sarker, S. (2006). Implementation Failure of an Integrated Software Package: A Case Study from the Far East. In M. Khosrow-Pour, D.B.A. (Ed.), Cases on Information Technology and Business Process Reengineering (pp. 302-316). IGI Global. https://doi.org/10.4018/978-1-59904-396-0.ch019

Chicago

Sarker, S. "Implementation Failure of an Integrated Software Package: A Case Study from the Far East." In Cases on Information Technology and Business Process Reengineering, edited by Mehdi Khosrow-Pour, D.B.A., 302-316. Hershey, PA: IGI Global, 2006. https://doi.org/10.4018/978-1-59904-396-0.ch019

Export Reference

Mendeley
Favorite

Abstract

The case study describes the process of implementation of an integrated software package at the Thai subsidiary (SMTL) of a Hong Kong-based multinational company (SMHK) engaged in the manufacturing of electronic equipment.

Request Access

You do not own this content. Please login to recommend this title to your institution's librarian or purchase it from the IGI Global bookstore.