Risk Assessment Using AHP in a Petrochemical Engineering Case Study

Risk Assessment Using AHP in a Petrochemical Engineering Case Study

Reza Manabi, Jamshid Salahshou, Abdolkarim Abasi Dezfouli
Copyright: © 2013 |Volume: 2 |Issue: 2 |Pages: 16
ISSN: 2160-9624|EISSN: 2160-9632|EISBN13: 9781466632189|DOI: 10.4018/ijrcm.2013040103
Cite Article Cite Article

MLA

Manabi, Reza, et al. "Risk Assessment Using AHP in a Petrochemical Engineering Case Study." IJRCM vol.2, no.2 2013: pp.42-57. http://doi.org/10.4018/ijrcm.2013040103

APA

Manabi, R., Salahshou, J., & Dezfouli, A. A. (2013). Risk Assessment Using AHP in a Petrochemical Engineering Case Study. International Journal of Risk and Contingency Management (IJRCM), 2(2), 42-57. http://doi.org/10.4018/ijrcm.2013040103

Chicago

Manabi, Reza, Jamshid Salahshou, and Abdolkarim Abasi Dezfouli. "Risk Assessment Using AHP in a Petrochemical Engineering Case Study," International Journal of Risk and Contingency Management (IJRCM) 2, no.2: 42-57. http://doi.org/10.4018/ijrcm.2013040103

Export Reference

Mendeley
Favorite Full-Issue Download

Abstract

Identification, quantification and assessment of uncertainty are essential in the petrochemical industry. During the construction or maintenance phases of an oil transportation pipe line, there is a high degree of risk for accidents, which would be fatal to the human resources and the environment. The Society of Consulting Engineers are subject matter specialists in Iran who are required to provide risk assessment services for oil and gas field pipe line projects. The purpose of this study was to survey 30 Consulting Engineer experts for their priorities on most likely risks, which occur in oil pipelines during construction or maintenance modes. The risk categories were informed from a literature review (theory deduction). Then the Analytical Hierarchy Procedure was used to normalize the uncertainty estimates and to rank the risk occurrence likelihood. The results indicated that gas compressors, ancillary facilities, storage tanks and pumping stations, respectively, had the highest risk level according to the experts.