Let us consider the following model problem. Suppose at a time Т is insured execution of m space projects value Ai,, i∈[1,m] each. The total value of the ensemble is X= Let Ri∈[0;1] be the level of risk that reflects the probability of default of i-th project. Levels Ri, i∈[1,m] are relied as independent.