Factors Causing Project Cost Overrun in the Telecommunications Industry in Oman

Factors Causing Project Cost Overrun in the Telecommunications Industry in Oman

Zahra A. Al Zadjali (Oman Telecommunication Company (Omantel), Muscat, Oman), Hamdi A. Bashir (Department of Industrial Engineering and Management, University of Sharjah, Sharjah, UAE) and Ali A. Maqrashi (Albanah Global LLC, Muscat, Oman)
DOI: 10.4018/ijitpm.2014070105
OnDemand PDF Download:
Available
$37.50
No Current Special Offers
TOTAL SAVINGS: $37.50

Abstract

Several studies have been carried out to investigate the causes of project cost overrun in different industries worldwide. This paper reports on the results of a study investigating the factors causing project cost overrun in Oman. Data required for this study were collected from 44 project engineers and managers of client and contracting companies involved in telecommunications projects. According to the analysis of results, 14 out of 37 factors are identified as major causes of project cost overrun. While most of the identified factors could affect any types of projects carried out in any country, one of the factors, namely lengthy tendering process might be unique to the projects carried out in Oman. Moreover, this study investigates the association between company size in terms of number of employees and causes of project cost overrun. The results show that there is no strong evidence to suggest that the causes of cost overrun differ significantly according to company size.
Article Preview
Top

Research Objectives

The telecommunications industry is one of the most dynamic industries where technological advancements seek faster connectivity and greater efficiency. The challenges that an operator faces are connected to its ability and competency in adapting to and managing inevitable changes, and subsequently maintaining a competitive edge over its competitors.

Complete Article List

Search this Journal:
Reset
Open Access Articles
Volume 13: 4 Issues (2022): 1 Released, 3 Forthcoming
Volume 12: 4 Issues (2021)
Volume 11: 4 Issues (2020)
Volume 10: 4 Issues (2019)
Volume 9: 4 Issues (2018)
Volume 8: 4 Issues (2017)
Volume 7: 4 Issues (2016)
Volume 6: 4 Issues (2015)
Volume 5: 4 Issues (2014)
Volume 4: 4 Issues (2013)
Volume 3: 4 Issues (2012)
Volume 2: 4 Issues (2011)
Volume 1: 4 Issues (2010)
View Complete Journal Contents Listing